Dublin Boulevard closure postponed for at least two weeks

(COLORADO SPRINGS) — The City of Colorado Springs said unforeseen site conditions have delayed the closure of Dublin Boulevard between Fieler Drive and Mustang Rim Drive.


PREVIOUS COVERAGE: Months long road closure on Dublin over the summer

The closure was originally scheduled to begin on May 27, but that date was pushed back to June 2. Now, due to delays in permitting caused by site conditions, the City said it does not have a confirmed start date, though it did say the delay would be for at least two weeks.

More information and up-to-date information can be found on the City’s website.

Leave a Reply

Your email address will not be published. Required fields are marked *